Machine Generated Data
Tags
Amazon
created on 2019-06-05
Clarifai
created on 2019-06-05
Imagga
created on 2019-06-05
Google
created on 2019-06-05
Microsoft
created on 2019-06-05
handwriting | 90.2 | |
| ||
letter | 79.8 | |
| ||
design | 57.9 | |
| ||
screenshot | 26.8 | |
| ||
document | 23.7 | |
|
Color Analysis
Categories
Imagga
text visuals | 100% | |
|
Captions
Microsoft
created on 2019-06-05
a screenshot of a cell phone | 83% | |
| ||
a screenshot from a cell phone | 76.8% | |
| ||
a screenshot of a cell phone screen with text | 76.7% | |
|
Text analysis
Amazon

STREET

EXCAVATION

STORIES

APPROVED

N.B.

FILED

BEAMS

BLDGS.

DIST.

PLAN

STREET NO. DIST. FILED APPROVED BLDGS. PLAN

STARTED

CERTIF.

TIER

ISSUED

MATERIAL

BUILDING

WORK

SOIL

STORIES MATERIAL HE HEIGHT STARTED COMPLETED CERTIF. ISSUED

COMPLETED

ft.

HEIGHT

EXCAVATION SOIL DAMP -PROOFING WORK

NO.

Base

-PROOFING

Cellar

floors

quality

filling

No. Base Cellar Non ft.

clay

1ST

rock gravel sand clay dry damp rock needed quality floors quality

gravel

sand

plastered

damp

dry

No.

rock

partitions

HE

needed

DAMP

covered

1ST TIER OF BEAMS Ht. iron flange covered plastered filling partitions

Non

flange

iron

Ht.

OF

HIL

N.B.
PLAN
DIST
FILED
BLDGS.
APPROVED
NO
STREET
CERTIF. 1SSUED
STARTED
COMPLETED
HEIGHT
MATERIAL
STORIES
No
word
side walls
ft
F. P. Non f.p.
Cellar
Base
DAMP-PROOFING WORK
walls
SOIL
EXCAVATION
floors
quality
quality
wet pockets of rock D, P. needed
rock gravel sand clay marsh tide water dry damp
F. P. BUILDING
1ST TIER OF BEAMS
filling
partitions
how covered
plastered
beams
bottom flange: f. p.
wood
filling
workmanship
Ht, above curb
iron
YARD
depth
Material
Walls
width
starts
Height Painted Roofed R
Starts
Width
Length
Kind
Courts
PER CENT LOT OCCUPIED
interior
2nd tier
ground level
cor.
D. W.
1
SHAFTS
f, p, s. c. doors
enclosed in cellar
material
ELEV.
2
f, D. s. c. doors
enclosed in cellar
material
INTAKE FOR COURT
yard
material
width
height
obstructed
street
egress
INTAKE FOR SHAFT
4
material
obstructed
cleaning
width
height
area
yard
streot
ROOMS
CELLAR
courts areas and yards 6" below floor
retaining walls
above sill
No.
location
ceiling
floor
lighted
painted
wals
W. w
CELLAR STAIRS
cellar entrance from outside
closet under first story stairs
enclosed
doors
outside
inside
PUMP
w. c
hand
for stores
waterpf
base
night light
light
power
No.
PAVING
DRAINAGE
yards
shafts
courts
areas
shafts
yard
sewer connected
courts
areas
EGRESS YARD TO STREET
F. P. passage
width
direct
cellar
height
1st story
FIRE ESCAPES
wall na built
apply F. card
yard
No. stacks
brackets
street
court
BOROUGH OF
(OVER)
TEN. HOUSE DEPT. FORM 195-37-20-11 (B) 10 000

N.B.

PLAN

DIST

FILED

BLDGS.

APPROVED

NO

STREET

CERTIF.

1SSUED

STARTED

COMPLETED

HEIGHT

MATERIAL

STORIES

No

word

side

walls

ft

F.

P.

Non

f.p.

Cellar

Base

DAMP-PROOFING

WORK

SOIL

EXCAVATION

floors

quality

wet

pockets

of

rock

D,

needed

gravel

sand

clay

marsh

tide

water

dry

damp

BUILDING

1ST

TIER

OF

BEAMS

filling

partitions

how

covered

plastered

beams

bottom

flange:

f.

p.

wood

workmanship

Ht,

above

curb

iron

YARD

depth

Material

Walls

width

starts

Height

Painted

Roofed

R

Starts

Width

Length

Kind

Courts

PER

CENT

LOT

OCCUPIED

interior

2nd

tier

ground

level

cor.

D.

W.

1

SHAFTS

f,

p,

s.

c.

doors

enclosed

in

cellar

material

ELEV.

2

INTAKE

FOR

COURT

yard

height

obstructed

street

egress

SHAFT

4

cleaning

area

streot

ROOMS

CELLAR

courts

areas

and

yards

6"

below

floor

retaining

sill

No.

location

ceiling

lighted

painted

wals

w

STAIRS

entrance

from

outside

closet

under

first

story

stairs

inside

PUMP

w.

c

hand

for

stores

waterpf

base

night

light

power

PAVING

DRAINAGE

shafts

sewer

connected

EGRESS

TO

passage

direct

1st

FIRE

ESCAPES

wall

na

built

apply

card

stacks

brackets

court

BOROUGH

(OVER)

TEN.

HOUSE

DEPT.

FORM

195-37-20-11

(B)

10

000