Machine Generated Data
Tags
Clarifai
created on 2019-06-05
Imagga
created on 2019-06-05
Google
created on 2019-06-05
Text | 98.4 | |
| ||
Document | 87.3 | |
| ||
Paper | 79.3 | |
| ||
Font | 78.3 | |
| ||
Paper product | 60.9 | |
|
Microsoft
created on 2019-06-05
text | 93.7 | |
| ||
menu | 92.5 | |
| ||
screenshot | 91.5 | |
| ||
handwriting | 51.5 | |
| ||
document | 24.4 | |
|
Color Analysis
Categories
Imagga
text visuals | 100% | |
|
Captions
Microsoft
created on 2019-06-05
a screenshot of text | 91% | |
| ||
a close up of text on a white background | 88.7% | |
| ||
a close up of text on a black background | 86.1% | |
|
Text analysis
Amazon

INSPECTIONS

Date

address

Inspector's

Chimneys

make

alterations

Mechanic's

7.

To

Architect,s

hereby

Light

10

Owner's

Owner's address

the

permit

Architect,s name

additions

Elevator

and

of

6.

undersigned hereby permit to make additions or alterations name

to

name

To the Superinfendent Public Bulldings Inspector's

Foundation

10 dwelling, tamilies Light and Elevator Shaits

or

buiiding?

Location

Shaits

6. Location of building, No.

Fire Stops

7. street ? Fire Stops

s. Mechanic's address

Bulldings

name following speeifieations: Foundation

Material of buiiding?

building,

speeifieations:

Material of

Mechanle's

following

Cambridge 10 INSPECTIONS Date

Superinfendent

dwelling,

No.

Public

undersigned

Cambridge

tamilies

street ?

s.

Cambridge

19

To

the

according

to

permit

Architect,s

name

is

nesrest

cross

street?

Fire

7

What

purpose

of

building

?

9.

Material

10

If

a

dwelling,

for

how

many

families

P

Light

and

Elevator

Shafts

11

Is

there

be

store

in

lower

story

;

No.

feet

deep,

rear,

f

front.

leans

Egress

stories

No,

height

from

level

ground

highest

part

roof?

How

near

line

adioining

lot

2

14

Ifne

street

1

5

1C

root

Size

eans

access

Strength

naterials

3d.

4th

5tb

Span

Distance

on

centre

Will

erected

solid

or

filled

land

foundation

laid

earth,

rock.

timber

piles

i

20.

21

Last

Inspection

1lat,

pitched,

mansard

gambrel

23

24

27

Estimated

cost?

e

heated

by

steam,

furnaces,

stoves

grates?

RENARKS

Signature

applicant

DETAIL

OF

THE

WORK

TO

BE

DONE

Date
INSPECTIONS
Cambridge
19
To the Superintendent of Public Buildings:-
Inspector's name
according to the following specifications permit to make additions or alterations
Foundation
ss
Architect,s name
Chimneys
Mechanic's name
Mechanic's address
4
5
What is the nesrest cross street?
Fire Stops
7
What
the purpose of building ?
9.
Material of building ?
10
If a dwelling, for how many families P
Light and Elevator Shafts
11
Is there to be a store in the lower story
; No. of feet deep,
; No. of feet rear,
f feet front.
leans of Egress
No. of stories ?
No, of feet in height from the level of the ground
the highest part of the roof?
How near line of adioining lot 2
14
How near Ifne of the street ?
1 5
1C
the root
Size of eans of access
Strength of naterials
3d.
4th
5tb
Span
Distance on centre
Will the building be erected on solid or filled land ?
the foundation be laid on earth, rock. timber or piles i
20.
21
Last Inspection
Will the root be 1lat, pitched, mansard or gambrel P
23
24
27
Will the building
Estimated cost? 1
e heated by steam, furnaces, stoves or grates?
RENARKS
Signature
applicant
DETAIL OF THE WORK TO BE DONE

Date

INSPECTIONS

Superintendent

Public

Buildings:-

Inspector's

following

specifications

make

additions

alterations

Foundation

ss

Chimneys

Mechanic's

address

4

Stops