Machine Generated Data
Tags
Clarifai
created on 2019-06-05
paper | 99.7 | |
| ||
document | 99.6 | |
| ||
no person | 98.4 | |
| ||
page | 97.8 | |
| ||
old | 96.8 | |
| ||
writing | 96.7 | |
| ||
retro | 96.5 | |
| ||
antique | 96 | |
| ||
book bindings | 94.5 | |
| ||
vintage | 93.6 | |
| ||
manuscript | 93.5 | |
| ||
administration | 93 | |
| ||
ancient | 92.7 | |
| ||
nostalgia | 90.6 | |
| ||
dirty | 90.6 | |
| ||
notebook | 89.7 | |
| ||
blank | 89.5 | |
| ||
text | 89.4 | |
| ||
handwriting | 88.5 | |
| ||
parchment | 88.2 | |
|
Imagga
created on 2019-06-05
Google
created on 2019-06-05
Text | 97.2 | |
| ||
Document | 87.9 | |
| ||
Paper | 86.3 | |
| ||
Paper product | 72 | |
| ||
Font | 68.6 | |
|
Microsoft
created on 2019-06-05
text | 98.8 | |
| ||
menu | 89.2 | |
| ||
letter | 85.6 | |
| ||
handwriting | 85.6 | |
| ||
document | 21.5 | |
|
Color Analysis
Feature analysis
Amazon
Document | 80.9% | |
|
Text analysis
Amazon
Daily
Report
Inspector.
of
Daily Report of Concrete Inspector.
REMARKS.
Proportion
SPECIFICATIONS.
Brand
Concrete
cubic
size
Reinforcement,
Concrete,
Location,
Cement
how
Owner,
Proportion mixture,
and
Bags
Contractor,
No.
Batches
Reinforcement, how placed,
feet
Brand of same,
mixture,
Architect,
stone
used,
sand
No. of cubic feet of stone and size used,
Barrels
made,
No. of Batches made,
placed,
No. of Bags or Barrels of Cement used,
same,
or
No. of cubic feet of sand used.
Date,
used.
Daily Report of Concrete Inspector.
Date,
Location,
Owner,
Architect,
Contractor,
SPECIFICATIONS.
No. of Batches made,
No. of Bags or Barrels of Cement used,
Brand of same,
No. of cubic feet of stone and size used,
No. of cubic feet of sand used,
Proportion of mixture,
REMARKS
Reinforcement, how placed,
Concrete, how used,.
Temperature,...
Work, how protected,.
Time, Concrete deposited in forms,
Time, forms removed,
Quality of Workmanship,
Signed,
Daily
Report
of
Concrete
Inspector.
Date,
Location,
Owner,
Architect,
Contractor,
SPECIFICATIONS.
No.
Batches
made,
Bags
or
Barrels
Cement
used,
Brand
same,
Proportion
mixture,
REMARKS
Reinforcement,
how
Concrete,
used,.
Temperature,...
Time,
Workmanship,
cubic
feet
stone
and
size
sand
placed,
Work,
protected,.
deposited
in
forms,
forms
removed,
Quality
Signed,