Machine Generated Data
Tags
Amazon
created on 2019-06-05
Text | 99.9 | |
| ||
Page | 97.1 | |
| ||
Menu | 67.9 | |
| ||
Handwriting | 65 | |
| ||
Book | 56.1 | |
|
Clarifai
created on 2019-06-05
Imagga
created on 2019-06-05
fare | 100 | |
| ||
menu | 100 | |
| ||
food | 72.2 | |
| ||
book | 33.2 | |
| ||
paper | 32.2 | |
| ||
business | 24.9 | |
| ||
text | 24.5 | |
| ||
page | 22.3 | |
| ||
pen | 20.8 | |
| ||
old | 19.5 | |
| ||
document | 18.6 | |
| ||
prayer | 18.4 | |
| ||
word | 17.9 | |
| ||
data | 17.4 | |
| ||
read | 17.3 | |
| ||
open | 17.1 | |
| ||
religion | 17 | |
| ||
office | 16.9 | |
| ||
bible | 16.7 | |
| ||
holy | 16.4 | |
| ||
16 | ||
| ||
information | 15.9 | |
| ||
finance | 15.2 | |
| ||
religious | 15 | |
| ||
antique | 14.7 | |
| ||
new | 14.6 | |
| ||
faith | 14.4 | |
| ||
god | 14.4 | |
| ||
testament | 13.8 | |
| ||
spiritual | 13.4 | |
| ||
financial | 13.4 | |
| ||
church | 13 | |
| ||
pages | 12.7 | |
| ||
close | 12.6 | |
| ||
study | 12.1 | |
| ||
letter | 11.9 | |
| ||
design | 11.8 | |
| ||
numbers | 11.5 | |
| ||
writing | 11.3 | |
| ||
scripture | 10.9 | |
| ||
gospel | 10.9 | |
| ||
belief | 10.7 | |
| ||
market | 10.7 | |
| ||
sheet | 10.3 | |
| ||
money | 10.2 | |
| ||
passage | 9.8 | |
| ||
words | 9.8 | |
| ||
month | 9.8 | |
| ||
schedule | 9.8 | |
| ||
art | 9.8 | |
| ||
king | 9.7 | |
| ||
calendar | 9.7 | |
| ||
plan | 9.5 | |
| ||
form | 9.3 | |
| ||
cover | 9.3 | |
| ||
note | 9.2 | |
| ||
chapter | 8.9 | |
| ||
detail | 8.9 | |
| ||
song | 8.8 | |
| ||
accounting | 8.8 | |
| ||
day | 8.6 | |
| ||
date | 8.6 | |
| ||
cross | 8.5 | |
| ||
composition | 8.5 | |
| ||
stock | 8.4 | |
| ||
economy | 8.3 | |
| ||
symbol | 8.1 | |
| ||
bank | 8.1 | |
| ||
rosary | 7.9 | |
| ||
planner | 7.9 | |
| ||
diary | 7.8 | |
| ||
ancient | 7.8 | |
| ||
income | 7.8 | |
| ||
pray | 7.8 | |
| ||
number | 7.5 | |
| ||
year | 7.3 | |
| ||
music | 7.2 | |
|
Google
created on 2019-06-05
Text | 97.3 | |
| ||
Document | 89 | |
| ||
Paper | 81.8 | |
| ||
Font | 68.6 | |
| ||
Paper product | 59.4 | |
|
Microsoft
created on 2019-06-05
menu | 87.2 | |
| ||
handwriting | 78.3 | |
| ||
screenshot | 52.1 | |
| ||
document | 49.1 | |
|
Feature analysis
Amazon

Book | 56.1% | |
|
Captions
Microsoft
a close up of text on a white background | 84.4% | |
| ||
a close up of text on a black background | 81.1% | |
| ||
a close up of text on a white surface | 81% | |
|
Text analysis
Amazon

PERMIT

FOR

APPLICATION FOR PERMIT TO BUILD.

BUILD.

TO

APPLICATION

Inspector

To

the

legible.

correct,

detail

To the Inspector of Buildings.

ownership

The

Separate

application

this

and

Buildings.

of

undersigned

Separate application required for every building.

Location. ownership and detail must be correct, complete and legible.

every

with

hereby

application.

must with this application.

building.

191

for

required

must

Ward

nearest

complete

The undersigned hereby applics for build the

What is

Plans

2.

be

Location. N.

What is the nearest street?

build

Plans be filed

applics for

Location.

be filed

Chelsea.

street?

Insp

Bu

land?

Material

the

laid

or

f

concrete,

specifications

Length

top?

Capped

with

thickness?

Size

floor

Ist,

Ist.

Span

access

roof?

there

any

hoistways

28.

law

30,

of

Estimated

ized

Address,

REMARKS.

PERMIT

MUST

Inspector

Chelsea.

Building

ownership

APPLICATION

hereby

applies

No.

name

6.

be

No

many

families

feet

"

10.

?

13.

ground

solid,

Location,

complete

legible.

Plans

must

FOR

191

permit

build

Ward

cross

Addres.

5,

7.

How

in

height

level

Will

on

17.

piles?

Diameter

concrete?

8

20.

grade?

21.

Esternal

walls,

bhe

3d.

Distance

26.

to

roofing?

building

i

Signature

owner

author-

OBTAINED

BEGINNING

shall

e

Ins

Location, ownership and detail must be correct, complete and legible.
Separate application required for every building.
Plans must be filed with this application.
APPLICATION FOR PERMIT TO BUILD.
191
Chelsea,
To the Inspector of Buildings.
The undersigned hereby applies for a permit to build according to the following specifications-
I. Location, No.
Ward
2. What is the nearest cross street?
3. Owner's name
Addres.
4. Architect's name
5, Mechanic's name
6. Material of Building?
7. Building to be occupied for?
No
stores?
8, How many families ?
9. Size of lot, No. of feet front?
Ft. deep?
Ft. rear?
Size of building, No. "
10.
11. How near line of Street ?
12. No.
stories?
13. No. of ft. in height from level
the ground to the highest part of roof?
Will the building be erected on solid, or filled land?
Material of foundaticn?
16. Wil the foundation be laid on earth, rock or piles?
14
15.
f of concrete, submit specifications
17.
Length of piles?
18
Diameter top?
Bottom?
19. Capped with stone or concrete?
8 20. Piles cut off what grade?
21. Esternal walls, thickness? basement,
4th
24
5tlh
Ist.
3d.
22. Party walls, thickness? basement,
bhe
23. Size of floor timbers, Ist,
5th
2d
3d.
4th
Ist.
5th
Roof.
2d,
3d.
4th.
24. Span
Distance on centre
25. Will the roof be flat, pitched, mansard or hip ?
26. Means of access to roof?
Material of roofing?
27
Are there any hoistways or elevators?
28.
How is the building heated?
Will the building conform to the requirements of law ?
29,
30, What will be the means of egress i
case of fre
31. Estimated cost?
Signature of owner or author-
ized representative,
Address,
REMARKS.
PERMIT
MUST
RE
OBTAINED
BEFORE
BEGINNING
WORK
Buildings) shall
e Inspector of
City of Chelsea.
ector of the Ci
uan uo paugux
Building Ins
submitted in
Plans must be

and

detail

every

BUILD.

following

2.

nearest

3.

Owner's

front?

Ft.

rear?

near

12.

part

erected

rock

18

stone

what

basement,

22.

23.

5th

4th.

centre

25.

roof

pitched,

hip

Are

elevators?

heated?

What

case

cost?

City

ector

paugux

application

filed

application.

TO

Chelsea,

To

for

according

specifications-

Architect's

Mechanic's

Building?

for?

stores?

building,

11.

stories?

ft.

from

highest

foundaticn?

16.

14

15.

submit

Bottom?

Piles

cut

off

24

5tlh

timbers,

4th

Roof.

2d,

flat,

mansard

27

is

requirements

29,

will

means

fre

representative,

RE

WORK

uan

submitted

correct,

Separate

required

building.

this

Buildings.

The

undersigned

a

I.

street?

4.

occupied

8,

9.

lot,

deep?

line

Street

filled

Wil

foundation

earth,

19.

Party

2d

24.

Means

conform

egress

31.

BEFORE

Buildings)

Ci

uo