Machine Generated Data
Tags
Amazon
created on 2019-06-05
Text | 99.9 | |
| ||
Page | 97.1 | |
| ||
Menu | 67.9 | |
| ||
Handwriting | 65 | |
| ||
Book | 56.1 | |
|
Clarifai
created on 2019-06-05
Imagga
created on 2019-06-05
menu | 100 | |
| ||
fare | 100 | |
| ||
food | 72.2 | |
| ||
book | 33.2 | |
| ||
paper | 32.2 | |
| ||
business | 24.9 | |
| ||
text | 24.5 | |
| ||
page | 22.3 | |
| ||
pen | 20.8 | |
| ||
old | 19.5 | |
| ||
document | 18.6 | |
| ||
prayer | 18.4 | |
| ||
word | 17.9 | |
| ||
data | 17.4 | |
| ||
read | 17.3 | |
| ||
open | 17.1 | |
| ||
religion | 17 | |
| ||
office | 16.9 | |
| ||
bible | 16.7 | |
| ||
holy | 16.4 | |
| ||
16 | ||
| ||
information | 15.9 | |
| ||
finance | 15.2 | |
| ||
religious | 15 | |
| ||
antique | 14.7 | |
| ||
new | 14.6 | |
| ||
faith | 14.4 | |
| ||
god | 14.4 | |
| ||
testament | 13.8 | |
| ||
spiritual | 13.4 | |
| ||
financial | 13.4 | |
| ||
church | 13 | |
| ||
pages | 12.7 | |
| ||
close | 12.6 | |
| ||
study | 12.1 | |
| ||
letter | 11.9 | |
| ||
design | 11.8 | |
| ||
numbers | 11.5 | |
| ||
writing | 11.3 | |
| ||
scripture | 10.9 | |
| ||
gospel | 10.9 | |
| ||
belief | 10.7 | |
| ||
market | 10.7 | |
| ||
sheet | 10.3 | |
| ||
money | 10.2 | |
| ||
passage | 9.8 | |
| ||
words | 9.8 | |
| ||
month | 9.8 | |
| ||
schedule | 9.8 | |
| ||
art | 9.8 | |
| ||
king | 9.7 | |
| ||
calendar | 9.7 | |
| ||
plan | 9.5 | |
| ||
form | 9.3 | |
| ||
cover | 9.3 | |
| ||
note | 9.2 | |
| ||
chapter | 8.9 | |
| ||
detail | 8.9 | |
| ||
song | 8.8 | |
| ||
accounting | 8.8 | |
| ||
day | 8.6 | |
| ||
date | 8.6 | |
| ||
cross | 8.5 | |
| ||
composition | 8.5 | |
| ||
stock | 8.4 | |
| ||
economy | 8.3 | |
| ||
symbol | 8.1 | |
| ||
bank | 8.1 | |
| ||
rosary | 7.9 | |
| ||
planner | 7.9 | |
| ||
diary | 7.8 | |
| ||
ancient | 7.8 | |
| ||
income | 7.8 | |
| ||
pray | 7.8 | |
| ||
number | 7.5 | |
| ||
year | 7.3 | |
| ||
music | 7.2 | |
|
Google
created on 2019-06-05
Text | 97.3 | |
| ||
Document | 89 | |
| ||
Paper | 81.8 | |
| ||
Font | 68.6 | |
| ||
Paper product | 59.4 | |
|
Microsoft
created on 2019-06-05
menu | 87.2 | |
| ||
handwriting | 78.3 | |
| ||
screenshot | 52.1 | |
| ||
document | 49.1 | |
|
Color Analysis
Feature analysis
Amazon
Book

Book | 56.1% | |
|
Categories
Imagga
text visuals | 100% | |
|
Captions
Microsoft
created on 2019-06-05
a close up of text on a white background | 84.4% | |
| ||
a close up of text on a black background | 81.1% | |
| ||
a close up of text on a white surface | 81% | |
|
Text analysis
Amazon

PERMIT

FOR

APPLICATION FOR PERMIT TO BUILD.

BUILD.

TO

APPLICATION

Inspector

To

the

legible.

correct,

detail

To the Inspector of Buildings.

ownership

The

Separate

application

this

and

Buildings.

of

undersigned

Separate application required for every building.

Location. ownership and detail must be correct, complete and legible.

every

with

hereby

application.

must with this application.

building.

191

for

required

must

Ward

nearest

complete

The undersigned hereby applics for build the

What is

Plans

2.

be

Location. N.

What is the nearest street?

build

Plans be filed

applics for

Location.

be filed

Chelsea.

street?

Insp

Bu

and

Separate

required

every

Plans

be

with

application.

No.

2.

What

is

the

nearest

cross

3.

name

Addres.

4.

Architect's

5,

Building?

of

front?

Ft.

deep?

rear?

Size

building,

"

10.

11.

How

near

line

Street

?

12.

stories?

ground

highest

part

roof?

Will

building

erected

on

solid,

or

filled

land?

Material

foundaticn?

15.

specifications

Length

piles?

18

Bottom?

19.

cut

21.

Esternal

walls,

thickness?

basement,

4th

24

5tlh

3d.

22.

Party

bhe

Ist,

5th

Roof.

2d,

4th.

24.

Span

roof

Means

Are

there

any

28.

to

will

means

i

fre

Signature

REMARKS.

PERMIT

MUST

BEFORE

WORK

Buildings)

shall

Inspector

City

Ci

uan

paugux

in

must

Location, ownership and detail must be correct, complete and legible.
Separate application required for every building.
Plans must be filed with this application.
APPLICATION FOR PERMIT TO BUILD.
191
Chelsea,
To the Inspector of Buildings.
The undersigned hereby applies for a permit to build according to the following specifications-
I. Location, No.
Ward
2. What is the nearest cross street?
3. Owner's name
Addres.
4. Architect's name
5, Mechanic's name
6. Material of Building?
7. Building to be occupied for?
No
stores?
8, How many families ?
9. Size of lot, No. of feet front?
Ft. deep?
Ft. rear?
Size of building, No. "
10.
11. How near line of Street ?
12. No.
stories?
13. No. of ft. in height from level
the ground to the highest part of roof?
Will the building be erected on solid, or filled land?
Material of foundaticn?
16. Wil the foundation be laid on earth, rock or piles?
14
15.
f of concrete, submit specifications
17.
Length of piles?
18
Diameter top?
Bottom?
19. Capped with stone or concrete?
8 20. Piles cut off what grade?
21. Esternal walls, thickness? basement,
4th
24
5tlh
Ist.
3d.
22. Party walls, thickness? basement,
bhe
23. Size of floor timbers, Ist,
5th
2d
3d.
4th
Ist.
5th
Roof.
2d,
3d.
4th.
24. Span
Distance on centre
25. Will the roof be flat, pitched, mansard or hip ?
26. Means of access to roof?
Material of roofing?
27
Are there any hoistways or elevators?
28.
How is the building heated?
Will the building conform to the requirements of law ?
29,
30, What will be the means of egress i
case of fre
31. Estimated cost?
Signature of owner or author-
ized representative,
Address,
REMARKS.
PERMIT
MUST
RE
OBTAINED
BEFORE
BEGINNING
WORK
Buildings) shall
e Inspector of
City of Chelsea.
ector of the Ci
uan uo paugux
Building Ins
submitted in
Plans must be

Location,

ownership

detail

correct,

complete

legible.

application

for

building.

filed

this

APPLICATION

FOR

TO

BUILD.

191

Chelsea,

To

Buildings.

The

undersigned

hereby

applies

a

permit

build

according

following

specifications-

I.

Ward

street?

Owner's

Mechanic's

6.

7.

Building

occupied

for?

No

stores?

8,

many

families

9.

lot,

feet

13.

ft.

height

from

level

16.

Wil

foundation

laid

earth,

rock

14

f

concrete,

submit

17.

Diameter

top?

Capped

stone

concrete?

8

20.

Piles

off

what

grade?

Ist.

23.

floor

timbers,

2d

Distance

centre

25.

flat,

pitched,

mansard

hip

26.

access

roofing?

27

hoistways

elevators?

heated?

conform

requirements

law

29,

30,

egress

case

31.

Estimated

cost?

owner

author-

ized

representative,

Address,

RE

OBTAINED

BEGINNING

e

Chelsea.

ector

uo

Ins

submitted