Human Generated Data

Title

Housing, Improved: United States. Massachusetts. Beverly. Massachusetts Building Permits

Date

c. 1910

People

Artist: Unidentified Artist,

Classification

Archival Material

Human Generated Data

Title

Housing, Improved: United States. Massachusetts. Beverly. Massachusetts Building Permits

People

Artist: Unidentified Artist,

Date

c. 1910

Classification

Archival Material

Machine Generated Data

Tags

Amazon

Book 99.5
Text 99.2
Page 93.9
Letter 79
Paper 75.1
Advertisement 64.2
Poster 60.4
Brochure 60.1
Flyer 60.1

Clarifai

text 99.5
page 99.4
book bindings 98.8
document 98.7
paper 98.5
vintage 98.2
poetry 98.1
book 97.5
manuscript 97.4
book series 97.1
old 95.4
time 95
retro 94.4
diary 94.3
antique 93.5
education 93.4
administration 93.2
scripture 93.1
print 92.6
illustration 92

Imagga

menu 36.8
book 36.4
brass 31.1
fare 29.8
paper 27.5
letter 26.6
binding 25.7
memorial 24.9
definition 24.5
business 24.3
design 23.7
association 23.7
document 23.2
artwork 22.9
text 22.7
decorative 22.6
cover 22.2
information 22.2
creative 21.2
creation 21.1
art 21.1
data 21
old 20.9
graphic 20.5
page 20.4
idea 19.6
backdrop 19
cloud 19
copy 18.6
brochure 18.5
advertisement 18.4
composition 17.9
conceptual 17.7
structure 17.6
advertising 17.3
associated 16.8
decoration 16.7
carpet 16.6
advertise 16.6
reflection 16.5
black 16.3
collection 16.3
picture 16.1
decor 15.9
keywords 15.8
antique 15.7
product 15.5
collage 15.4
food 15.4
element 14.9
texture 14.6
word 13.2
detail 12.9
bible 12.8
religion 12.6
read 12.5
vintage 12.4
newspaper 12.3
print 12.3
religious 12.2
new 12.2
education 12.1
ancient 12.1
representation 12.1
mosaic 10.9
aged 10.9
more 10.8
prayer 10.6
ink 10.6
mix 10.6
god 10.5
writing 10.4
close 10.3
pattern 10.3
message 10.1
open 9.9
holy 9.7
drawing 9.6
blank 9.4
modern 9.1
office 8.8
notebook 8.7
spiritual 8.7
faith 8.6
book jacket 8.6
grunge 8.5
church 8.3
retro 8.2
symbol 8.1
textured 7.9
words 7.8
pages 7.8
empty 7.7
line 7.7
development 7.6
finance 7.6
communication 7.6
sheet 7.5
note 7.4
financial 7.1

Google

Text 98.2
Document 83.9
Paper 83.7
Font 68.6
Paper product 66.7

Microsoft

text 98.9
letter 94.8
screenshot 78.1
book 51.2
plaque 35.5

Feature analysis

Amazon

Book 99.5%

Captions

Microsoft

a close up of text in front of a building 75.6%
a close up of text on the side of a building 74.9%
a close up of text on a building 74.8%

Text analysis

Amazon

Department
building
order
manner
inspection
builders
performed
the
construction
owners
avoid
In order that the inspection work of the building
that
work
delay
may
and
of
buildings,
to avoid delay in the construction of buildings,
In
Department be performed in such
such
in
must
be
notice
desired
owners and builders must give twenty-four hours'
to
Building
inspector
are
granted
of an inspector are desired
Permiis are granted and
hours'
twenty-four
an
give
notice to the Building Inspector when the services
Permiis
Inspector
services
may a manner as
a
when
as

Google

building
in
manner
and
must
give
twenty-four
to
condition
be
with
which
before
placed
upon
surfaces
plastered
stopping
the
lathing
pias
inspection
work
of
buildings,
an
inspect
are
desired
complied
Permits
superstruc-
ture
outer
fire
is
In
that
performed
as
owners
notice
services
granted
buildings
all
following
ap-
proved:-
First
rest,
any
Second
built.
Third.
Chimneys
proofing
inspected
tering
order
such
avoid
delay
construction
hours'
Inspector
when
regulations
The
foundations
load
completed
In order that the inspection work of the building Department may be performed in such a manner as to avoid delay in the construction of buildings, owners and builders must give twenty-four hours' notice to the Building Inspector when the services of an inspect or are desired granted and buildings accepted upon condition that all building regulations are complied The following must be inspected and ap- Permits are with proved:- First The material upon which foundations are to rest, before any load is placed upon it. Second All foundations before the superstruc- ture is built. Third. Chimneys before the outer surfaces are plastered Fire stopping and fire proofing must be completed and inspected before the work of lathing and pias tering is started
Department
may
a
builders
Building
or
accepted
material
it.
All
Fire
started