Human Generated Data

Title

"Aluminum City" Housing, New Kensington, Pennsylvania, 1941-1942: Schedule of finishes, key to symbols, schedule of drawings, window schedule (1/4" = 1'-0")

Date

1941-1942

People

Artist: Walter Gropius, German 1883 - 1969

Classification

Prints

Credit Line

Harvard Art Museums/Busch-Reisinger Museum, Gift of Walter Gropius, BRGA.94.2

Human Generated Data

Title

"Aluminum City" Housing, New Kensington, Pennsylvania, 1941-1942: Schedule of finishes, key to symbols, schedule of drawings, window schedule (1/4" = 1'-0")

People

Artist: Walter Gropius, German 1883 - 1969

Date

1941-1942

Classification

Prints

Credit Line

Harvard Art Museums/Busch-Reisinger Museum, Gift of Walter Gropius, BRGA.94.2

Machine Generated Data

Tags

Amazon
created on 2019-04-05

Text 83.6
Plan 78.9
Plot 78.9
Diagram 78.9
Texture 72.4
Rug 70.7

Clarifai
created on 2018-03-22

desktop 97.5
pattern 96.8
texture 96.2
modern 95.7
no person 94.5
glass items 94.3
futuristic 93.7
design 93.1
contemporary 93
construction 92.8
abstract 92.8
window 92
geometric 90.3
architecture 89.9
urban 89.3
technology 88.6
expression 88.6
wallpaper 87.5
color 85.7
fabric 84.7

Imagga
created on 2018-03-22

brass 59.6
memorial 47.1
backdrop 46.2
structure 42.9
design 36.1
cloud 33.6
decor 32.8
cover 32.4
element 32.3
carpet 31.2
art 30.6
texture 30.6
artwork 30.3
decorative 30.1
creative 30.1
advertising 29.8
associated 29.6
association 29.6
definition 29.5
brochure 29.3
graphic 29.2
advertise 29.2
advertisement 29
composition 28.3
conceptual 28.3
collection 28
decoration 27.6
pattern 26
data 25.6
idea 25
fabric 24.6
information 24
textured 22.8
mosaic 22.5
business 21.9
letter 21.1
old 20.2
copy 19.5
surface 19.4
keywords 18.8
wallpaper 18.4
collage 18.3
grunge 17.9
modern 17.6
detail 16.9
material 16.1
canvas 15.2
rough 14.6
black 13.9
more 13.7
dirty 13.6
mix 13.5
textile 13.3
drapery 12.8
industrial 12.7
paper 12.6
vintage 12.4
cotton 12.4
closeup 12.2
fashion 12.1
continuity 11.9
antique 11.8
thread 11.7
tile 11.6
development 11.4
sheet 11.3
style 11.2
aged 10.9
fiber 10.6
color 10.6
computer 10.6
wall 10.3
clothing 9.9
denim 9.8
digital 9.7
metal 9.7
technology 9.7
cloth 9.6
creation 9.6
industry 9.4
plate 9.3
network 9.3
communication 9.3
metallic 9.2
retro 9
new 8.9
weave 8.8
pants 8.8
text 8.7
jeans 8.6
rusty 8.6
iron 8.4
shape 8.2
backgrounds 8.1
stitch 8
menu 8
steel 8
book 7.9
garment 7.9
space 7.8
ornament 7.8
construction 7.7
web 7.6
hard 7.6
newspaper 7.6
product 7.6
clothes 7.5
stone 7.4
daily 7.3

Google
created on 2018-03-22

blue 96.8
text 88.1
azure 81.1
line 72
sky 68.1
pattern 66.2
product 64.9
texture 62.7
screenshot 59.8
font 59.3
computer wallpaper 54.7
angle 54.3
energy 53.2
square 51.6

Microsoft
created on 2018-03-22

text 99
blackboard 90.8

Color Analysis

Feature analysis

Amazon

Rug 70.7%

Categories

Captions

Azure OpenAI

Created by gpt-4o-2024-05-13 on 2024-12-16

The image depicts a detailed blueprint-like technical drawing with various sections, grids, and charts. ### Central Part - **Schedule of Interior Finishes for All Buildings:** - The main body of the blueprint includes a large grid that categorizes different "Locations" and "Spaces" (e.g., lobby, kitchen, classrooms) against types of floors, walls, ceilings, and other finishes. - The columns and rows detail specific finish materials (such as tile, carpet, paint types) and their application in different areas of the building. ### Right Side - **Schedule of Drawings:** - This area lists different categories such as "Surveys," "Architectural," "Utilities," "Heating & Plumbing," "Electrical," "Landscaping," each with specific drawing titles and their corresponding description numbers. ### Lower Section - **Key to Symbols:** - This section deciphers various symbols used within the blueprint, segregated by categories such as "Site," "Heating and Plumbing," "Architectural," and "Electrical." ### Bottom Right - **Room Schedule:** - Offers a detailed account of room types and their associated requirements or specifications, shown with symbols and notations. ### Additional Information - The entire layout is presented in white lines on a blue background, characteristic of traditional blueprints used in architecture and engineering. - The information is clearly organized and categorized, likely intended for use by architects, builders, or construction professionals to understand the finishes and materials needed for the construction or renovation of a building. Overall, the document is an exhaustive technical representation for a building’s interior finishes and related construction details.

Created by gpt-4 on 2024-12-16

The image shows a blueprint with various sections containing text, charts, and symbols. It has a monochromatic blue background with white lines and text. This is a characteristic look of traditional cyanotype blueprints used in architectural and engineering design. The text and charts appear to be organized into different categories related to building construction, such as schedules for interior finishes, details of drawings, utilities, and possibly key symbols used for heating, plumbing, and electrical layouts. Some sections are labeled as "Schedule of Interior Finishes for Buildings," "Schedule of Drawings," and "Key to Symbols," among others. The layout is structured and grid-like, which is typical for technical plans to convey detailed information systematically. The specific details of the text are not clearly legible due to the resolution and size of the image provided.

Anthropic Claude

Created by claude-3-haiku-20240307 on 2024-12-16

This image appears to be a blueprint or architectural drawing. It shows a detailed schedule of interior finishes and drawings for various buildings or structures. The image contains a grid-like layout with various rows and columns filled with information about the different spaces, materials, and other details related to the construction and design of these buildings. There are also additional sections at the bottom of the image that provide additional technical information, such as details related to heating, plumbing, electrical, and landscaping. The overall layout and content of the image suggest this is a comprehensive document used for planning and coordinating the construction and design of a set of buildings or structures.

Created by claude-3-5-sonnet-20241022 on 2024-12-16

This is an architectural blueprint or technical drawing showing a detailed schedule of interior finishes and various other specifications for a building project. The image appears in the classic blueprint blue and white color scheme. The document is divided into several sections including: 1. A large matrix-style chart at the top showing "Schedule of Interior Finishes - All Buildings" 2. A "Schedule of Drawings" section on the right side breaking down different types of plans (Architectural, Heating & Plumbing, Electrical, etc.) 3. A "Key to Symbols" section at the bottom containing multiple subsections for Site, Architectural, Heating and Plumbing, and Electrical symbols and notations 4. A ribbon schedule diagram in the bottom right corner showing various configurations The document is highly detailed with numerous rows and columns containing technical specifications, checkmarks, and annotations. It appears to be a comprehensive reference document that would be used during construction to specify various building requirements and standards. The overall layout is very organized and systematic, typical of professional architectural documentation from the pre-digital era.

Meta Llama

Created by us.meta.llama3-2-90b-instruct-v1:0 on 2024-12-16

The image presents a comprehensive blueprint for a building, featuring a detailed layout of various rooms and spaces. The blueprint is divided into several sections, each with its own unique characteristics and features. **Section 1: Room Layout** The first section of the blueprint shows the layout of the rooms in the building. The rooms are labeled with numbers and letters, and the walls are represented by solid lines. The doors and windows are also indicated, providing a clear understanding of the room's layout. **Section 2: Electrical and Plumbing** The second section of the blueprint focuses on the electrical and plumbing systems in the building. The electrical outlets and switches are marked with symbols, while the plumbing fixtures such as sinks and toilets are also indicated. This section provides valuable information for electricians and plumbers working on the project. **Section 3: HVAC and Ventilation** The third section of the blueprint deals with the heating, ventilation, and air conditioning (HVAC) system. The ductwork and vents are shown, along with the location of the HVAC units. This section is essential for HVAC technicians and engineers. **Section 4: Fire Suppression** The fourth section of the blueprint highlights the fire suppression system in the building. The location of fire alarms, sprinkler heads, and fire extinguishers are all indicated. This section is critical for ensuring the safety of occupants in case of a fire emergency. **Section 5: Accessibility Features** The fifth section of the blueprint showcases the accessibility features in the building. Ramps, elevators, and accessible restrooms are all marked, making it easier for people with disabilities to navigate the building. **Section 6: Finishes and Materials** The sixth section of the blueprint provides information on the finishes and materials used in the building. The type of flooring, walls, and ceilings are all specified, along with the materials used for doors and windows. This section is useful for contractors and builders who need to source materials for the project. **Section 7: Schedules and Timelines** The seventh section of the blueprint outlines the schedules and timelines for the project. The construction schedule, including start and end dates, is provided, along with a list of tasks and milestones. This section helps project managers stay on track and ensure that the project is completed on time. Overall, the blueprint provides a detailed and comprehensive overview of the building's design and construction. It serves as a valuable resource for architects, engineers, contractors, and other stakeholders involved in the project.

Created by us.meta.llama3-2-11b-instruct-v1:0 on 2024-12-16

The image depicts a detailed blue print of a building's interior and exterior, showcasing various rooms, spaces, and features. The blueprint is divided into sections, each labeled with a specific category, such as "Location," "Schedule of Interior Finishes - All Buildings," "Schedule of Drawings," "Key to Symbols," "Site," "Heating & Plumbing," "Electrical," and "Landscaping." These sections provide a comprehensive overview of the building's design and layout. The blueprint includes numerous symbols and abbreviations, which are explained in the "Key to Symbols" section. This section helps to decipher the meaning behind each symbol, ensuring that the reader understands the intended purpose of each feature or element. The "Schedule of Interior Finishes - All Buildings" section lists various materials and finishes used throughout the building, including paint, flooring, and wall coverings. This section provides valuable information for architects, builders, and contractors who need to specify the materials and finishes for a particular project. The "Schedule of Drawings" section outlines the various drawings that are included in the blueprint, including floor plans, elevations, and cross-sections. This section helps to identify the different views of the building and provides a clear understanding of the overall design. The "Key to Symbols" section explains the meaning behind each symbol used on the blueprint. This section is essential for understanding the intended purpose of each feature or element and ensuring that the reader can accurately interpret the information presented. The "Site" section provides information about the building's location, including the site plan, topography, and environmental conditions. This section is crucial for architects and builders who need to understand the site's characteristics and how they will impact the building's design and construction. The "Heating & Plumbing" section outlines the heating and plumbing systems used in the building, including the type of heating and cooling systems, water supply and drainage systems, and sanitary fixtures. This section is essential for ensuring that the building's systems are functional and meet the necessary safety standards. The "Electrical" section provides information about the building's electrical systems, including the type of electrical distribution, lighting, and power systems. This section is critical for ensuring that the building's electrical systems are safe and meet the necessary safety standards. The "Landscaping" section outlines the building's landscaping features, including the type of vegetation, hardscapes, and outdoor spaces. This section is important for creating an aesthetically pleasing and functional outdoor environment. Overall, the blueprint provides a detailed and comprehensive overview of the building's design and layout, making it an essential tool for architects, builders, and contractors.

Text analysis

Amazon

TITLE
DRAWINGS
DUILDINGS
DVOON
SCHEDULE
DUILDINGS SCHEDULE Of DRAWINGS
FINISHES
UTICITIES
chedule FINISHES
RenARKS
chedule
6-2
Of

Google

ADLT ou dunDi DYOON OF DEFENSE HOUSING RIISBURG
ou
DYOON
DEFENSE
RIISBURG
ADLT
dunDi
OF
HOUSING