Machine Generated Data
Tags
Imagga
created on 2022-06-04
Google
created on 2022-06-04
Color Analysis
Categories
Imagga
text visuals | 99.9% | |
|
Captions
Microsoft
diagram, engineering drawing | 99.5% | |
|
Text analysis
Amazon

WALL

PLAN

&

FLOOR

WALL FOUNDATION

For

SECTION

FOR

FOUNDATION

SIDE

PLAN OF WHARF FLOOR

Field

SECTION OF WALL & WHARF

FRONT

Book

PLAN OF

FRONT ELEVATION

PLAN OF STRAP FOR

WHARF

902

STRAP

PILES

ELEVATION

OF

BELAY PILES

OUTSIDE

BELAY

and

Scale

SIDE ELEVATION OF

the

Note:

SECTION SH

variable

field

E

OUTSIDE W

see

be

is

SH

W

each

Feb.

Note: For field notes, see Field Book 902

radius

Station

of

and the radius of 7may be variable

Feb. 17.1903

pile

3394

VA

P

notes,

WhatFand

E Camb Power Station WhatFand Seawall

Strap is 4 fit each pile

17.1903

Scale VA ٠٠/٠٥

Strap

Scale 2'-1'0"

Note.

Seawall

Scale 14"-1-0"

fit

filled

Neepine a 3394

٠٠/٠٥

Camb Power

2'-1'0"

7may

4

Neepine

14"-1-0"

a

FRONT ELEVATION
Scale 14-1-0"
Note.
Strap is to fit each pile
and the radius of may be variable
O
PLAN OF STRAP FOR
BELAY PILES
Scale 2-1.0°
E. Camb. Pourt Station, Wurf and Seawall
To be
ENJO
of Lond
در تیم ملی والے سی
PLAN OF WHARF FLOOR
Fre"planting
Fier 14-25-2
filled
SECTION OF WALL & WHARF
l'a2'drift belt nach pie
S
SIDE ELEVATION OF
WALL FOUNDATION
Note: For field notes, see Field Book*902
04
00000
PLAN OF
WALL FOUNDATION
Scale 4-1.0"
Feb. 17,1903
El 200
4'2"
✔
*...
4+2
SECTION SHO
OUTSIDE WH
O
New 3394

FRONT

ELEVATION

Scale

14-1-0

"

Note

.

Strap

is

to

fit

each

pile

and

the

radius

of

may

be

variable

O

PLAN

OF

STRAP

FOR

BELAY

PILES

2-1.0

°

E.

Camb

Pourt

Station

,

Wurf

Seawall

To

ENJO

Lond

در

تیم

ملی

والے

سی

WHARF

FLOOR

Fre

planting

Fier

14-25-2

filled

SECTION

WALL

&

l'a2'drift

belt

nach

pie

S

SIDE

FOUNDATION

:

For

field

notes

see

Field

Book

*

902

04

00000

4-1.0

Feb.

17,1903

El

200

4'2

✔

...

4

+

2

SHO

OUTSIDE

WH

New

3394