Machine Generated Data
Tags
Color Analysis
Feature analysis
Amazon
Clarifai

Clarifai
Mobile phone | 44.9% | |
Categories
Imagga
created on 2022-06-04
text visuals | 99.7% | |
Captions
Microsoft
created by unknown on 2022-06-04
diagram | 46.6% | |
Clarifai
No captions written
Salesforce
Created by general-english-image-caption-blip on 2025-05-17
a photograph of a black and white photo of a black and white photo of a clock tower
Created by general-english-image-caption-blip-2 on 2025-07-07
a black and white photo of a blueprint of a building
OpenAI GPT
Created by gpt-4o-2024-11-20 on 2025-06-12
This image is a vintage engineering drawing with dark exposure and faded details, likely depicting part of the Boston Elevated Railway system's underground structures. The diagram appears to be labeled "Cambridge Main St. Subway" at the top, dated January 1907. It is a proposed layout of underground elements, including a "Catch Basin," "Hydrant Connection," and pipes such as "Gas Pipe" and "Storm Sewer." Technical notations and measurements are included throughout, with a scale of 1 inch = 4 feet. The image also contains handwritten annotations and a date noted as "May 19, 08" at the bottom. The drawing seems to be an early infrastructure plan related to the subway or street utilities.
Created by gpt-4o-2024-08-06 on 2025-06-12
The image is an architectural plan or engineering drawing related to the Boston Elevated Railway and the Cambridge Main Street Subway. It is labeled "Proposed Location Underground Structures for Main St." The drawing is scaled at 1/2 inch corresponding to 1 foot and is dated January 1907. The drawing includes several labels and features:
- There's an indication of the "Street Main St. Sidewalk" at the top, marked with what appears to be sidewalk and street surface details.
- A building or structure outline is visible, with markings for a "Catch Basin," which likely refers to a stormwater management feature.
- The catch basin is detailed with dimensions and various components like "Hydrant Connection" and pipelines marked as "Water Pipe" and a circle labeled "Gas Pipe."
- Additionally, a "Storm Sewer" is depicted in the lower portion.
- The text in the top right corner identifies the drawing and includes a note stating it was checked by James A. St. Clair and is marked with an engineer's designation.
- There is a handwritten date at the bottom, "May 19, 08," along with a number "4207," which could be an archive or reference number.
Overall, this appears to be a historical engineering drawing related to the underground infrastructure for a streetcar or subway system in Boston.
Anthropic Claude
Created by anthropic.claude-3-haiku-20240307-v1:0 on 2025-06-17
The image appears to be an engineering or architectural diagram or schematic. It shows various technical drawings and diagrams, including labels for a "Boston Elevated Railway" and a "Proposed Location Underground Structures for Main St." The image is in black and white and has a vintage or historical appearance.
Created by us.anthropic.claude-3-opus-20240229-v1:0 on 2025-06-17
The image shows an old technical drawing or blueprint. It depicts the proposed location for an underground structure, likely a subway station, in Cambridge, Massachusetts near Main St.
The drawing includes measurements and labels indicating the location is the "Boston Elevated Railway" and provides details on the "Proposed Location Underground Structures For Main St."
Various cross-sections, plan views, and callouts provide technical details about the underground structure's layout and dimensions. The aged, grainy quality of the black and white photograph suggests this is a historical engineering document, likely from the early-to-mid 20th century based on the drawing style and notation.
Created by us.anthropic.claude-3-5-sonnet-20241022-v2:0 on 2025-06-17
This is a historical engineering blueprint or technical drawing from the Boston Elevated Railway system, specifically showing plans for the Cambridge Main St. Subway. The image appears to be from January 1903 and shows proposed underground structures for Main Street. It's a black and white technical drawing that includes various structural elements and cross-sections, with circular and linear components that appear to be showing tunnel or station infrastructure details. The drawing includes some text and measurements, though many details are difficult to make out due to the dark nature of the image. This type of document would have been used during the early construction and planning phases of Boston's subway system, which was among the first in the United States.
Meta Llama
Created by us.meta.llama3-2-11b-instruct-v1:0 on 2025-06-04
The image depicts a black-and-white blueprint or architectural drawing of the Boston Elevated Railway, specifically the Cambridge Main St. Subway. The drawing is dated May 19, '05, and features a scale of 1/4" = 1'. The drawing includes various labels and notations, such as "PROPOSED LOCATION UNDERGROUND STRUCTURES FOR MAIN ST." and "ELEVATED RAILWAY CAMBRIDGE MAIN ST. SUBWAY". The drawing also includes a key or legend that explains the different symbols and abbreviations used on the drawing.
The drawing appears to be a detailed plan for the construction of the subway tunnel and its associated infrastructure, including the location of the tunnel, the alignment of the tracks, and the placement of various structures such as bridges and stations. The drawing also includes notes and annotations that provide additional information about the project, such as the location of utilities and the layout of the tunnel's ventilation system.
Overall, the image provides a fascinating glimpse into the planning and design process of the Boston Elevated Railway, and offers valuable insights into the history of urban transportation infrastructure in Boston.
Created by us.meta.llama3-2-90b-instruct-v1:0 on 2025-06-04
The image appears to be a blueprint or architectural drawing of an underground structure, likely a subway tunnel. The drawing is in black and white, with various lines, symbols, and text that provide information about the design and layout of the tunnel.
In the center of the image, there is a large, rectangular shape that represents the tunnel itself. The tunnel is divided into sections, each with its own set of dimensions and features. There are also several smaller shapes and symbols scattered throughout the image, which may represent different components of the tunnel, such as pipes, ducts, or electrical conduits.
Along the top edge of the image, there is a series of text labels that provide additional information about the tunnel. These labels include the name of the project, the location of the tunnel, and the date of the drawing. There are also several numbers and measurements listed along the edges of the image, which may refer to the dimensions of the tunnel or the location of specific features.
Overall, the image provides a detailed and technical view of the design and layout of an underground tunnel. It is likely that this image was created by an architect or engineer as part of the planning and construction process for the tunnel.
Amazon Nova
Created by amazon.nova-lite-v1:0 on 2025-06-03
The image appears to be a technical drawing or blueprint related to the Boston Elevated Railway, specifically showing the proposed location for underground structures along Main Street in Cambridge. The drawing is in black and white and includes various annotations, measurements, and diagrams.
Key elements in the image:
Title and Location: The drawing is titled "BOSTON ELEVATED RAILWAY CAMBRIDGE MAIN ST SUBWAY PROPOSED LOCATION UNDERGROUND STRUCTURES FOR MAIN ST." This indicates that it is a plan for the subway system in Cambridge, focusing on Main Street.
Date: The drawing is dated "Jan 1807," which likely refers to January 1807, although the exact year might be misprinted or misinterpreted.
Scale: The drawing includes a scale notation, indicating the dimensions and proportions of the structures depicted.
Annotations: There are several annotations and labels throughout the drawing, such as "Corrected June 18th" and "Gorge," which might refer to corrections made to the plan or specific locations along Main Street.
Diagrams: The drawing features various diagrams and sections, including:
- Main Street: The central axis of the drawing, along which the underground structures are proposed.
- Water Pipe: A diagram indicating the placement of a water pipe, possibly for utility purposes.
- Gorge: A specific location or feature along Main Street, possibly a gorge or a notable landmark.
- Storm Sewer: A diagram showing the location of a storm sewer, likely for drainage purposes.
Technical Details: The drawing includes technical details such as measurements, dimensions, and notes on the construction of the underground structures.
Signatures and Initials: There are signatures and initials at the bottom of the drawing, possibly indicating the engineers or designers responsible for the plan.
Overall, the image is a detailed technical blueprint for the proposed underground structures along Main Street in Cambridge, part of the Boston Elevated Railway system.
Created by amazon.nova-pro-v1:0 on 2025-06-03
The image shows a black-and-white diagram of the Boston Elevated Railway Cambridge Main St. Subway Proposed Location for Main St. The diagram is dated January 1907 and contains various details and annotations. It includes a scale and a note that reads "Corrected Jan. 1907." The diagram depicts the proposed location of the subway structures, including a tunnel, a shaft, and a connection to the water pipe. The diagram also includes measurements and annotations, such as "New Shaft A. Grove" and "Storm Sewer." The image has a watermark in the bottom right corner with the text "4207."
Google Gemini
Created by gemini-2.0-flash-lite on 2025-05-30
This is a blueprint-style diagram of proposed underground structures for Main Street in Cambridge, Massachusetts. The diagram, dated May 19, 1909, is titled "BOSTON ELEVATED RAILWAY, CAMBRIDGE, MAIN ST SUBWAY, PROPOSED LOCATION UNDERGROUND STRUCTURES FOR MAIN ST."
The diagram shows a cross-section of the street, including a "Typical Main St Sidewalk" labeled as 10'-6" wide. It illustrates the placement of various underground utilities and structures, including:
- A "Catch Basin"
- A "Hydrant Connection"
- A "Water Pipe"
- A "Gas Pipe"
- A "Storm Sewer"
A vertical structure, possibly a vent or access point, is positioned near the curb line of the street. It includes a "New style D Frame".
The diagram is stamped with the date "May 19, 09" and the number "*4207" is present in the bottom right corner of the image.
The top right of the image has the title and signatures of what appears to be the chief engineer.
Created by gemini-2.0-flash on 2025-05-30
Here's a description of the image based on the information I can extract:
The image shows a blueprint or technical drawing, likely from the early 20th century. The title at the top indicates it's related to the Boston Elevated Railway, specifically the Cambridge Main Street Subway. The drawing depicts the proposed location of underground structures for Main Street.
Here's a breakdown of what's visible in the drawing:
- Text and Titles: The drawing is labeled with information such as "Boston Elevated Railway," "Cambridge Main St. Subway," and "Proposed Location Underground Structures for Main St." There's also a note about the scale, a date of January 1902, and a signature "George. A. Kimball, Chief Engineer." A date stamp at the bottom reads "May 19, 09."
- Sidewalk: The top part of the drawing shows a "Typical Main St. Sidewalk."
- Underground Structures: The main part of the drawing details underground features:
- "Catch Basin" is labeled, which appears to be a chamber or structure for collecting water.
- "Storm Sewer" is labeled as a circular object.
- "Water Pipe" and "Gas Pipe" are also shown as circular objects.
- A "Hydrant Connection" links to a fire hydrant depicted above ground.
The drawing is a technical illustration with precise lines and labels, indicative of architectural or engineering plans from the period.
Mistral Pixtral
Created by us.mistral.pixtral-large-2502-v1:0 on 2025-06-04
The image is a historical blueprint or engineering drawing related to the Boston Elevated Railway, specifically for the Cambridge - Main St Subway. The drawing is titled "Proposed Location Underground Structures for Main St." and is dated January 1907.
Key details in the image include:
- Title and Date: The title and date are prominently displayed at the top right corner of the drawing.
- Scale: The scale of the drawing is indicated as 1 inch equals 100 feet.
- Corrections: There are notes indicating corrections made to the drawing, such as "Correct Line of Center" and "Stairs Omitted."
- Drawings: The drawing includes various underground structures, such as tunnels, staircases, and other subway components.
- Labels: Different parts of the drawing are labeled with dimensions and descriptions, such as "Granite Curb," "Sidewalk," and "Roadway."
- Date Stamp: There is a date stamp at the bottom left corner indicating "May 13, 08."
- Drawing Number: The drawing number "4207" is visible at the bottom right corner.
The drawing appears to be a detailed plan for the construction of underground structures for the subway, showing the layout and dimensions of various components.
Qwen
No captions written