Machine Generated Data
Tags
Amazon
created on 2019-06-06
Text | 99.8 | |
| ||
Page | 99.6 | |
| ||
Book | 93.9 | |
| ||
Handwriting | 71 | |
| ||
Paper | 57.9 | |
|
Clarifai
created on 2019-06-06
Imagga
created on 2019-06-06
Google
created on 2019-06-06
Microsoft
created on 2019-06-06
text | 93 | |
| ||
menu | 86.5 | |
| ||
letter | 78.5 | |
| ||
handwriting | 71 | |
| ||
document | 41.3 | |
|
Color Analysis
Feature analysis
Amazon
Book | 93.9% | |
|
Text analysis
Amazon
APPLICATION
PERMIT
FOR
APPLICATION FOR PERMIT TO BUILD.
TO
BUILD.
INSPECTOR
BUILDINGS.
THE
Fall
River,
191
TO THE INSPECTOR OF BUILDINGS.
No.
Fall River, Mass.. 191
according
7.
Material.
State
hereby
2. Material.
permit
the
2.
applies
Theundersigned hereby applies permit build according the following
build
Ward
following
3.
3. the Owner's
Owner's
Theundersigned
15.
Location?
1.
1. State how many erected.
many
building?
Mass..
OF
11.
how
feet
of
District?
feet deep
12.
deep
4.
erected.
6.
9.
5.
No.
APPLICATION FOR PERMIT TO BUILD.
191
Fall River, Mass.,
TO THE IN.SPECTOR OF BUILDINGS.
The undersigned hereby applies for a permit to build according to the following specificatiions:
1. State how many buildings to be erected,
2. Material,
3. What
the Owner's name?
Architect's name?
**
4
Ruilder's name?
5
Location?
Ward
6
Nearest street?
No.
7
4
District?
Purpose of building?
10. If a dwelling, for how many families?
the lower story?
Is there to be a store
11
12. Size of lot: No. of feet front
No. of feet rear
No, of feet deep
The height of the building above the grade of the street is
13
feet
14. Size of building: No.
15. No. of Stories
No. of feet rear
No
f feet deep
feet front
16. No. of feet in height from the level of the ground to the highest part of the roof
feet wide;
feet long:
Size of ell:
feet high.
17
Distance from surrounding buildings: front.
19. Distance back from line of street
feet; side
feet; side
18
feet: rear
feet
20. What is the height of the nearest building?
21
Height of 1st, 2nd, and 3rd story?
22. Will foundation be laid on earth, rock, timber or piles?
23. What is the material -
the foundation?
flat, pitch or mansard?
Will the roof
24
25. Will the building be heated by steam, furnaces, stoves or grates?
26. Will the building conform to requirements of law?
27. Number of brick walls
and where placed?
Are there privies
water closets?
28
29, How is the building to be ventilated?
30. If fire escapes are required, how many?
o be used for business purposes?
31, Is the lower story
32. Probable cost?
Remarks
Work must not be commenced until the expiration of seven days from the date of this notice.
[SIGN HERE]
(See diagram on other side.)
[ADDRESS]
No.
APPLICATION
FOR
PERMIT
TO
BUILD.
191
Fall
River,
Mass.,
THE
IN.SPECTOR
OF
BUILDINGS.
The
undersigned
hereby
applies
for
a
permit
to
build
according
the
following
specificatiions:
1.
State
how
many
buildings
be
erected,
2.
Material,
3.
What
Owner's
name?
Architect's
**
4
Ruilder's
5
Location?
Ward
6
Nearest
street?
7
District?
Purpose
of
building?
10.
If
dwelling,
families?
lower
story?
Is
there
store
11
12.
Size
lot:
feet
front
rear
No,
deep
height
building
above
grade
street
is
13
14.
building:
15.
Stories
No
f
16.
in
from
level
ground
highest
part
roof
wide;
long:
ell:
high.
17
Distance
surrounding
buildings:
front.
19.
back
line
feet;
side
18
feet:
20.
nearest
21
Height
1st,
2nd,
and
3rd
22.
Will
foundation
laid
on
earth,
rock,
timber
or
piles?
23.
material
-
foundation?
flat,
pitch
mansard?
24
25.
heated
by
steam,
furnaces,
stoves
grates?
26.
conform
requirements
law?
27.
Number
brick
walls
where
placed?
Are
privies
water
closets?
28
29,
How
ventilated?
30.
fire
escapes
are
required,
many?
o
used
business
purposes?
31,
story
32.
Probable
cost?
Remarks
Work
must
not
commenced
until
expiration
seven
days
date
this
notice.
[SIGN
HERE]
(See
diagram
other
side.)
[ADDRESS]